CS 2550 – Principles of Database Systems (Spring 2024)
Dept. of Computer Science, University of Pittsburgh
Assignment #4: Query Processing & Optimization
Release: April 10, 2024 Due: 8:00PM, April 22, 2024
Goal
The goal of this assignment is to better understand the query evaluation process.
Description
The following is a fragment of the university database schema.
Employee (EmployeeID, First, Last, Gender, DOB, Address, Phone, SNO, Salary)
PK(EmployeeID)
FK(SNO) --> Studio(StudioNum)
Studio (StudioNum, StudioName, Manager, Budget)
PK(StudioNum)
FK(Manager) --> Employee(EmployeeID)
Movie (movieID, producedBy, title, Budget, filmedAt)
PK(movieID)
FK(producedBy) --> Studio(StudioNum)
Consider four possible organizations of the tables Employee(E)-Studio(S)-Movie(M):
1. Tables E, S and M are heap files & no access methods exist on any of them
2. Tables E and S are sorted files and M is a heap file & no access methods exist on any of them
3. Tables E, S and M are heap files & access methods (hashing) exist only on M
4. Table E is a sorted file and tables S and M are heap files & access methods exist on E and
M, one of which is hash and the other is index
Further assume the following statistics:
Available Cache Memory (CM) to be 22 pages.
Attributes belonging to the same table all have the same average size.
When using hash join, the smaller record will be the partitioning part.
The distribution of values for the attribute filmedAt in the table Movie is: 50% ’PGH’, 30%
’PHI’, and 20% ’NYC’.
Movie: r = 500, bfr = 5, BP rj = 100.
Studio: r = 250, bfr = 5, BDep = 50.
Employee: r = 1250, bfr = 5, BEmp = 250.
Note that r is the total number of tuples in a table, bfr is the blocking-factor, and B is the
total number of blocks of a table.
Questions [100 points]
Q1 [20 points] Produce the heuristic query evaluation tree of the following SQL statement assuming no access structures available, and describe in details how the evaluation of the query would
be:
SELECT S.StudioName, COUNT(M.movieID), SUM(M.Budget)
FROM EMPLOYEE AS E, Studio AS S, Movie AS M
WHERE M.producedBy = S.StudioNum AND E.SNO = S.StudioNum
GROUP BY S.StudioName
HAVING COUNT(E.EmployeeID) < 15;
State any additional assumptions. (Hint: some operators can be combined into a single algorithm).
Q2 [80 points] Consider the query evaluation tree as discussed in class of the following SQL
statement.
SELECT M.movieID, M.producedBy, E.First, E.Last, E.Gender
FROM Employee AS E, Studio AS S, Movie AS M
WHERE M.producedBy = S.StudioNum AND S.Manager = E.EmployeeID
AND M.filmedAt=‘PGH’;
Based on your pittID, you have two database organizations assigned to you from the above organizations in order to answer this question. For those two organizations, identify sub trees that
represent groups of operations which can be executed by a single algorithm. For each such sub tree,
there are potentially multiple methods that can be combined to implement it as a single algorithm.
Please provide the following:
The description of one such implementation (steps & data structures) out of all possible ones
for each of the above cases.
The I/O cost of your implementation at each level.
Compute the total I/O cost.
You are asked to answer the question for two database organizations, those are based on your
pittID, as follows:
ddh32, tiw81, yiy161, dhb51, yul251, sml153, nia135, dtk28:
You are required to do the first and second organizations only.
mas937, yux85, anp407, shk148, nat134, aba166, mod53, jeb386:
You are required to do the first and third organizations only.
aym50, bsp22, yuw328, shy158, btl26, shp184, jah292, tbt8:
You are required to do the first and fourth organizations only.
What & How to submit
You are required to submit exactly one PDF file under your pitt user name (e.g.,
pitt01.pdf). In addition to providing the answer, you are expected to: include your
name and pitt ID at the top of the PDF file.
After preparing your solution, submit your file (i.e., the prepared PDF) that contains
your solution by going to the class’ Gradescope by either navigating to the Gradescope
Homepage and selecting the course CS 2550 from the Course Dashboard or by clicking
the Gradescope Navigation option under our course Canvas page.
You must submit your assignment before the due date (8:00 PM, Apr. 22, 2024).
There are no late submissions.
Note that you are required to use a graph tool (such as MS-Word, MS Powerpoint, MS
Visio, idraw, draw.io, etc.) to generate your diagrams and the text that explain them.
Handwritten/Hand-drawn diagrams and/or text will not be accepted/graded
and will receive a zero. Hand-written and digitized/scanned images will
receive a zero (including scanned, photos, or electronically drawn using a
smart pen submissions).
Academic Honesty
The work in this assignment is to be done independently. Discussions with other students on
the assignment should be limited to understanding the statement of the problem. Cheating
in any way, including giving your work to someone else will result in an F for the course and
a report to the appropriate University authority.
请加QQ:99515681 邮箱:99515681@qq.com WX:codinghelp
- HGC环电强化国际业务领导架构 谭君骥及Ravindran Mahalingam分别担任专精职务
- 海伯森六维力传感器:助力人形机器人产业发展的创新力量
- 达闼董事长黄晓庆:以技术破局致胜从未止步
- 从辅助到核心,企业如何基于AI Agent升级品牌数字营销
- 国产2.5亿超高分辨率图像传感器发布,主要面向机器视觉领域
- 西部数据推出多款超高速、大容量存储解决方案
- 中关村e谷承办“科创耀未来 奋进谱新篇”企业家创新论坛圆满落幕
- 航科卫星“汕头数字一号”卫星发射成功!
- Gartner 最新魔力象限出炉!ManageEngine卓豪成功入围
- 科技重塑物流,英特尔&集和诚加速智慧物流发展!
- 数智赋能 向“新而行” 坦克与装甲车辆学术与发展论坛召开
- 赛诺威盛:大孔径专科化CT领航者
- 网易硬刚腾讯 两大游戏玩家之间的口水仗不断
- 全球“最独特”的一台华为 nova 6 5G 版手机是什么样子的?
- 拼多多抖音淘宝京东,谁是真低价?